"Radiant Heating Solutions"

Filling Your System

4 tips to remember when filling your system

Pressurize the system to 18-25 PSI.

At least a 1/2 HP transfer pump is required to get the system up to pressure.

Use distilled water and do NOT mix more than 50% glycol.

Documentation

Panel Installation/Filling Your System

Thermostat Wiring (TH135 & TH114)

Fill and purge each loop individually to ensure all air is out of the system.

E-mail: info@hydro-smart.com

PH: 763-331-3066